Registered, compliant, and built on documented process
Certifications

Registered, compliant, and built on documented process

The registrations and internal standards behind every project we deliver, plus what our quality inspection actually checks at each milestone.

★ 4.9/5Customer VerifiedGST Registered Company10-Year Warranty
Registrations & Standards

What we operate under

Government of India

GST Registration

Registered under GSTIN 27AACCZ5366K1Z5, compliant for all commercial billing and contracts.

Ministry of Corporate Affairs

Company Registration

Zemara Spaces is a registered company operating since 2019.

Internal Safety Standard

Site Safety Compliance

All active sites follow documented safety protocols including PPE enforcement and periodic audits.

Internal QA Standard

Quality Assurance Process

Stage-wise quality checks documented and photo-logged at every major construction and interior milestone.

Legal Entity

Zemara Spaces

GSTIN

27AACCZ5366K1Z5

Our Quality Process

4 Steps of Milestone Quality Inspection

Every project moves through stage-wise inspection, documented and photo-logged — not a single check at handover. Here is what gets reviewed at each milestone.

Step 01 Inspection

Foundation & Structure

  • Reinforcement placement and spacing against structural drawings, before concrete is poured
  • Concrete mix consistency and curing time compliance
  • Column and slab alignment against approved layout
Step 02 Inspection

Electrical & Plumbing (MEP)

  • Wiring gauge and conduit routing against the electrical layout
  • Earthing and circuit load testing before walls are closed
  • Plumbing pressure testing at all wet-area points
Step 03 Inspection

Finishing & Waterproofing

  • Waterproofing membrane continuity at all wet areas and the roof slab
  • Tile/flooring level and grout consistency
  • Paint coat count and surface preparation
Step 04 Inspection

Interior Installation

  • Modular unit fit, alignment and hardware function (hinges, channels, soft-close)
  • Material and finish match against the approved specification sheet
  • Punch-list closure before final handover